To meet the growing needs of students, the campus is expanding the Activities and Recreation Center (ARC) by 16,300 square feet in the existing central courtyard area.

The expansion will optimize:

  • Space for strength and cardio equipment
  • Functional uses of the building
  • Energy efficiency of the building

Student fees will not increase to fund the expansion. The project is funded from the FACE/LLEAP initiative that was passed in 1999 to build the ARC. The referendum was designed to allow for the building to be operated, maintained and renovated as it aged. Therefore, the project is being built without any increase in student fees.

Temporary Access Points

The ARC will remain open during construction. Entrances to the ARC will be rerouted based on what you need to access.

+

Main Entrance (Access from La Rue)

  • Basketball and volleyball courts
  • Cardio/strength machines
  • Climbing wall
  • Equipment check out
  • Locker rooms
  • Multi-Activity Court (MAC)
  • Racquetball, squash and wallyball courts
  • Weights
  • Towel check out
  • Track
+

Pavilion Entrance (Access the ramp to the northeast entry)

  • Cycle Studio
  • Dance Studio
  • Functional training (coming soon)
  • Group exercise studios
  • Member Services
  • Martial Arts Studio
  • Pavilion Fitness Studio
+

Business Entrance (Access between the ARC Lobby and CAMB entries)

  • ARC staff offices
  • Campus Recreation program offices
    • Fitness and Wellness
    • Informal Recreation
    • Intramural Sports
    • Sport Clubs
  • Business Center
    • Passports
  • Events
    • Ballroom
    • Meeting rooms
  • Wellness to Go vending machine
  • Study space

Impact to Services

+

MAC (ARC 138) Classes

Classes will continue to be held at the Multi-Activity Court (MAC). The entrance will not change during construction. You can continue to enter from ARC 138, located at the south side of the building.

This section will be updated as the construction schedule develops.

If you have questions regarding construction, please visit Member Services by accessing the Pavilion entrance.

+

Equipment

All equipment currently in use will still be available in a new location.

+

Pro Shop

The Pro Shop will remain closed until construction is completed. Intramural Sports clothing will be relocated to the Downtown Store. Visit UC Davis Stores for hours and more store locations.

+

Study Spaces

Some study spaces will still be available during construction, but will likely be noisy. The renovated Memorial Union offers additional study space.

Why Expand the ARC?

Student enrollment has increased by about 6,000 students since the facility opened in 2004. Currently, the ARC’s weight room and cardio equipment aren’t meeting the demands of students. The growing student population will add additional strain on the existing facility.

Expanding the ARC facility will include improvements such as:

  • Enhanced Wi-Fi
  • A new boxing studio
  • More strength equipment (racks, benches and Olympic weightlifting platforms)
  • Upgraded locker rooms
  • New day lockers throughout first and second levels
  • Outdoor exercise space
  • Expanded cycling studio
  • Expanded cardio loft on the second floor

The expansion will result in shorter wait times, allowing ARC members to complete their workouts and return to class, studying or work.